Tewaycell 48V 400Ah 20kWh All-in-one Mobile ESS Built-in 12kW Hybrid off-grid Three Phase Inverter,BMS,Equalization Module
Free Shipping & TAX:
Our current price is the final price, free shipping and tax, you don't need to pay any other fees.
This model will be shipped from China, about 45-60 working days after shipment!
【Energy Expansion】: Tewaycell 48V 20kWh All-in-one battery built-in 12KW three phase inverter, it can connect all in one battery of the same model to parallel, and it can also connect 20KWH battery (without inverter) to expand capacity,but the battery model must be the same.
【Usage】: Tewaycell 20kWh All-in-one lifepo4 lithium battery offers outstanding safety, high energy density, long life, excellent temperature performance, and eco-friendly power generation. Perfect for solar home systems, power outages, off-grid living.
【Feature】: Tewaycell 20kWh All-in-one ESS with active balancer module and lifepo4 temperature-sensitive fire extinguisher; Battery and inverter integrated into one, easy to install, plug and play.
Model | TW-AO-MB51300-AC380V-12KW-EU | TW-AO-MB51400-AC380V-12KW-EU |
BATTERY TECHNICAL SPECIFICATION | ||
Battery model | TW-MB51300-300A-HWB | TW-MB51400-300A-HWB |
Number of batteries | 1 | 1 |
Battery Energy | 15360Wh | 20480wh |
Battery Capacity | 300Ah | 400Ah |
Battery Type | LiFePO4 | |
Battery Rated Voltage | 51.2V | |
Battery Working Voltage Range | 44.8~57.6V | |
Maximum Charging Current | 260A | |
Maximum Discharging Current | 260A | |
DOD Designed Life-span | 80% >6000 Cycles @0.2c/25'℃ charging/Discharging at 80%DoD,Until 80% |
|
INVERTER TECHNICAL SPECIFICATION | ||
INVERTER TECHNICAL | ASP48120SH3 | |
PV CHARGE | ||
Solar Charge Type/Number of MPPT | MPPT/2 | |
Maximum Input Power | 9000W/9000W | |
Maximum PV Charging Current | 22/22A | |
Maximum PV Operating Voltage | 800Vdc/800Vdc | |
MPPT Voltage Range | 200-650Vdc/200-650Vdc | |
AC CHARGE | ||
Input Voltage Range | Phase voltage 170~280v,line voltage 305~485V | |
Input frequency range | 50/60H | |
Bypass Overload phase Current | 35A | |
ACOUTPUT | ||
Rated Output Power 12000W | ||
Frequency | 50Hz+0.3Hz/60Hz+0.3Hz | |
switching time | 10ms(Typical value) | |
EFFICIENCY | ||
MPPT tracking efficiency | 99.90% | |
Maximum efficiency of battery inverter | ≥92% | |
European efficiency | 97.50% | |
GENERAL DATA | ||
Communication | RS485/CAN/WIFI | |
Storage time/temperature | 6 months @25℃;3 months @35℃;1 months @45℃; | |
Charging temperature range | 0~45℃ | |
Discharging temperature range | -10~45℃ | |
Operation Humidity | 5%~85% | |
Nominal Operation Altitude | <2000m | |
Cooling Mode | Force-Air Cooling | |
Ingress Protection Rating | IP20 | |
Recommended Operation Environment | Indoor |
Europa
Belgien, Bulgarien, Dänemark, Deutschland, Estland, Finnland, Frankreich, Griechenland, Irland, Italien, Lettland, Litauen, Niederlande, Norwegen, Österreich, Polen, Portugal, Rumänien, Schweden, Slowakei, Slowenien, Spanien, Tschechische Republik, Ungarn, Vereinigtes Königreich
Unsere Lieferzeit informationen auf einen Blick:
Gesamtlieferzeit = Bearbeitungszeit + Laufzeit (+ alle Feiertage und Wochenenden)
Schiff nach USA/Nordamerika
Lagerhaus |
Versandoption |
Bearbeitungszeit |
Voraussichtliche Lieferzeit |
---|---|---|---|
USA/Kanada |
Fedex/DHL/UPS (steuerfrei) |
1~3 Werktage |
3~7 Werktage |
CN |
Per Sea+Express (Fedex/DHL/UPS, steuerfrei) |
3~7 Werktage |
30 ~ 45 arbeitstage |
Schiff in die EU
Lagerhaus |
Versandoption |
Bearbeitungszeit |
Voraussichtliche Lieferzeit |
---|---|---|---|
DE/POL |
DHL/GLS/DPD/UPS/TNT (steuerfrei) |
1~3 Werktage |
3~7 Werktage |
CN |
Per Bahn/Sea+Express (DHL/GLS/DPD/UPS/TNT, steuerfrei) |
3~7 Werktage |
45 ~ 60 arbeitstage |
Schiff nach Asien-Pazifik/Mittlerer Osten
Lagerhaus |
Versandoption |
Bearbeitungszeit |
Voraussichtliche Lieferzeit |
---|---|---|---|
CN |
Auf dem Seeweg/Eisenbahn+Express (DPD/Maut/UPS/Fedex/TNT, steuerfrei) |
3~7 Werktage |
45 ~ 60 arbeitstage |
1, versenden wir zu unserer Versand agentur nach Qualitäts prüfung, überprüfen und gut verpackt. 3-7 Arbeitstage.
2, Schifffahrts agentur sammeln genug Waren für einen Container, dann Schiff nach Deutschland auf dem Seeweg. 7-15 Werktage. Gleichzeitig senden sie die Bestell informationen an DPD Express, um die Tracking-Nummer zu erhalten.
3, Nach etwa einem Monat Seereise zum deutschen Hafen.
4, Der Spediteur erledigt die Zoll abfertigung formalitäten, sortiert die Pakete und sendet sie dann an das entsprechende DPD-Express lager. 5-7 Werktage
5, DPD Express starten die Lieferung an Kunden, von nun an wird die Logistik Updates von DPD Express sein. 3-7 tage lieferung.
In den 2-4 Phasen schreiben die Trang-Updates immer "DPD-Rechen zentrum, Bestell informationen wurden an DPD übertragen".