Tewaycell 25.6V 314Ah 8KWH LiFePO4 Battery 24KWH 32KWH 40KWH Home ESS Built in Boost Module DC400V High Voltage Energy Storage System
Free Shipping, Free customs duties and Free tax, you don't need to pay any other fees! DDP Shipping method!
The Tewaycell 25.6V 314Ah LiFePO4 High Voltage Energy Storage System is built-in DC boost module converting 25.6V battery voltage to 400V DC output.
LiFePO4 Chemistry: Proven safety, 6000+ cycle life, and stable performance.
Built-in DC Boost Module: Converts 25.6V to 400V DC output, 25.6V 314Ah 8KWH per layer.
Scalable Capacity: Available in 24KWH, 32KWH, 40KWH etc to match your household energy needs.
Comprehensive Protection: Over-temperature, over-current, short-circuit, over-charge, over-discharge, and cell over-voltage protection.
Silent Operation: Natural cooling and equipped with heat sinks, no fan noise.
Multi-Protocol Communication: CAN, RS232, RS485 for HV inverters compatibility, such as Goodwe ES/ET HV series、Solis RHI/S6 HV series、Growatt SPH HV series、AISWEI HV series、SWatten HV series、Sinexcel ISUNA HV series、Solinteg MHS HV series、PYLONTECH etc. (Contact us for compatibility with other inverters)
| MODEL | 3P-HV-DC400V-1P8S-314 | |
| Rate Power | 4200W | |
|
High voltage side |
Work voltage(VDC) | 350~450 |
| Rated voltage(VDC) | 400 | |
|
Max continuous output power(W) |
4200 | |
| Battery | Battery type | LFP |
| Number of battery strings | 8 | |
| Battery capacity | 314AH | |
| Rated voltage(VDC) | 25.6 | |
|
Minimum full-load voltage (VDC |
22.4 | |
| Max.full-load voltage(VDC) | 28.8 | |
| Working Voltage(VDC) | 20~30 | |
|
BCMU parameters |
Number of voltage detection channels |
8 |
|
Number of temperature detection channels |
8 | |
| Battery current detection | -375A~+375A,≤±1% | |
| Max number of parallel units | 16 | |
| Switching time | 6ms | |
| Operating mode | Charging/Discharging/Standby/Shutdown (Sleep)/Maintenance | |
| Isolation method | High-frequency isolation | |
| Cooling method | Natural cooling | |
| Protection |
Over-temperature protection,Over-current protection,Short-circuit protection, Over-charge protection,Over-discharge protection,Cell over-voltage |
|
| Operating temperature | -20°℃~50°℃,No derating | |
| Storage temperature | -40℃~70℃ | |
| Relative humidity |
5%~95%,no cooling |
|
| Operating altitude | 4000m MAX,>2000m derating | |
| Communication interface | CAN、232、485 | |
Europe
Austria, Belgium, Bulgaria, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Ireland, Italy, Latvia, Lithuania, Netherlands, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, United Kingdom
* If your consignee's address is Ukraine, the shipping time may exceed 60 days due to the war. If you place an order in our store, then you accept this shipping time. Thank you for your support and understanding.
Regarding the shipping of orders from Swiss customers:
If you are a Swiss customer, please fill in the address within the EU when placing an order, such as Germany, Italy, France, etc. Thank you for your understanding and support!
Regarding the shipping of orders from Romania customers:
Due to Romanian government regulations, goods may be subject to secondary customs clearance when transported to Romania. If secondary customs clearance occurs, the customer is responsible for the secondary customs clearance and the cost of the secondary customs clearance.
Our delivery time information at a glance:
Total Delivery Time = Handling Time + Transit Time (+ any holidays and weekends)
Ship to USA/North America
|
Warehouse |
Shipping Option |
Handling Time |
Estimated Delivery Time |
|---|---|---|---|
|
US/CA |
Fedex/DHL/UPS(Tax Free) |
1~3 working days |
3~7 working days |
|
CN |
By Sea+Express (Fedex/DHL/UPS, Tax Free) |
3~7 working days |
30~45 working days |
Ship to EU
|
Warehouse |
Shipping Option |
Handling Time |
Estimated Delivery Time |
|---|---|---|---|
|
DE/POL |
DHL/GLS/DPD/UPS/TNT(Tax Free) |
1~3 working days |
3~7 working days |
|
CN |
By Railway/Sea+Express (DHL/GLS/DPD/UPS/TNT, Tax Free) |
3~7 working days |
45~60 working days |
Ship to Asia Pacific/Middle East
|
Warehouse |
Shipping Option |
Handling Time |
Estimated Delivery Time |
|---|---|---|---|
|
CN |
By Sea/Railway+Express (DPD/Toll/UPS/Fedex/TNT, Tax Free) |
3~7 working days |
45~60 working days |
1, We ship to our shipping agency after quality test, check and well packed. 5-7 work days.
2, Shipping agency collect enough goods for a container, then ship to EU by sea. 7-15 working days. At the same time, they send the order information to DPD express to get the tracking number.
3, After about one month's sea voyage to the EU port.
4, The shipping agent handles the customs clearance formalities, sorts the packages, and then sends them to the corresponding DPD express warehouse. 5-10 working days
5, DPD express start the delivery to customers, from now on, the logistics will be updates by DPD express. 3-7 days delivery.
In the 2-4 stages, the traking updates always write "DPD data centre, Order information has been transmitted to DPD."
CE


SGS

ISO9001

KC

IEC

UN38.3 Test


MSDS

