SRNE 220V 10KW 12KW Hybrid Off-grid Inverter 48V SPI 10KW 12KW Three Phase Inverter Neutral Inverter
Free Shipping, Free customs duties and Free tax, you don't need to pay any other fees!
SRNE 10KW 12KW Hybrid Off-grid Inverter Dual MPPT 48V To 230VAC Hybrid Solar Inverter
Note :
The battery capacity of the correct matching system is determined according to the specific usage requirements of the load and application scenarios, otherwise it will easily lead to insufficient battery capacity or excessive waste of power generation. For details, please refer to the manual recommendation or consult online customer service.
Introduction:
SPI series corresponds to SRNE ASP/ASF series;SPI/ASP/ASF series is a new type of solar energy storage inverter control inverter integrating solar energy storage & utility charging and energy storage, AC sine wave output. It adopts DSP control and features high response speed, reliability, and industrial standard through an advanced control algorithm.
MODEL | SPI-8K-H3 | SPI-10K-H3 | SPI-12K-H3 | Can Be Set |
INVERTER OUTPUT | ||||
Rated Output Power | 8,000W | 10,000W | 12.000W | |
Max.Peak Power | 16,000W | 20,000W | 24,000W | |
Rated Output Voltage | 400Vac,three-phase | √ | ||
Capacity of Motor Load | 5HP | 6HP | 6HP | |
Rated Frequency | 50/60Hz | √ | ||
Output Waveform | pure sine wave | |||
Switching Time | 10ms (typical) | |||
BATTERY | ||||
Battery Types | Li-ion /Lead-Acid /User Defined | √ | ||
Rated Battery Voltage | 48Vdc | |||
Voltage Range | 40~60Vdc |
√ |
||
Max.PV Charging Current | 180A | 220A | 260A |
√ |
Max.Utility /Generator Charging Current | 100A | 120A | 120A | √ |
Max.Hybrid Charging Current | 180A | 220A | 260A | √ |
PV INPUT | ||||
No.of MPPT | 2 | |||
Max.Input Power | 6,000W/6,000W | 7,500W/7,500W | 9,000W/9,000W | |
Max.Input Current | 22A/22A | |||
Max.Open-circuit Voltage | 800Vdc/800Vdc | |||
MPPT Operating Voltage Range | 200~650Vdc/200~650Vdc | |||
UTILITY /GENERATOR INPUT | ||||
Input Voltage Range | phase voltage 170~280V,line voltage 305~485V | |||
Input Frequency Range | 50/60Hz | |||
Bypass Overload Current | 63A | |||
EFFICIENCY | ||||
MPPT Tracking Effciency | 99.9% | |||
Max.Battery Inverter Effciency | ≥92% | |||
European Efficiency | 97.2% | 97.5% | 97.5% | |
GENERAL | ||||
Dimensions | 620*445*130mm | |||
Weight | 27kg | |||
Protection Degree | IP20,indoor only | |||
Ambient Temp | -10~55℃,>45℃ derated | |||
Noise | <60dB | |||
Cooling Method | air cooling | |||
Warranty | 18 months | |||
COMMUNICATION | ||||
Internal Interface | RS485/CAN/USB /Dry contact | √ | ||
External Module (optional) | Wi-Fi/GPRS | √ | ||
CERTIFICATION | ||||
Safety | IEC62109-1,IEC62109-2,UL1741 | |||
EMC | EN61000-6-1,EN61000-6-3,FCC15 classB | |||
RoHS | Yes |
Europe
Austria, Belgium, Bulgaria, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Ireland, Italy, Latvia, Lithuania, Netherlands, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, United Kingdom
* If your consignee's address is Ukraine, the shipping time may exceed 60 days due to the war. If you place an order in our store, then you accept this shipping time. Thank you for your support and understanding.
Regarding the shipping of orders from Swiss customers:
If you are a Swiss customer, please fill in the address within the EU when placing an order, such as Germany, Italy, France, etc. Thank you for your understanding and support!
Regarding the shipping of orders from Romania customers:
Due to Romanian government regulations, goods may be subject to secondary customs clearance when transported to Romania. If secondary customs clearance occurs, the customer is responsible for the secondary customs clearance and the cost of the secondary customs clearance.
Our delivery time information at a glance:
Total Delivery Time = Handling Time + Transit Time (+ any holidays and weekends)
Ship to USA/North America
Warehouse |
Shipping Option |
Handling Time |
Estimated Delivery Time |
---|---|---|---|
US/CA |
Fedex/DHL/UPS(Tax Free) |
1~3 working days |
3~7 working days |
CN |
By Sea+Express (Fedex/DHL/UPS, Tax Free) |
3~7 working days |
30~45 working days |
Ship to EU
Warehouse |
Shipping Option |
Handling Time |
Estimated Delivery Time |
---|---|---|---|
DE/POL |
DHL/GLS/DPD/UPS/TNT(Tax Free) |
1~3 working days |
3~7 working days |
CN |
By Railway/Sea+Express (DHL/GLS/DPD/UPS/TNT, Tax Free) |
3~7 working days |
45~60 working days |
Ship to Asia Pacific/Middle East
Warehouse |
Shipping Option |
Handling Time |
Estimated Delivery Time |
---|---|---|---|
CN |
By Sea/Railway+Express (DPD/Toll/UPS/Fedex/TNT, Tax Free) |
3~7 working days |
45~60 working days |
1, We ship to our shipping agency after quality test, check and well packed. 3-7 work days.
2, Shipping agency collect enough goods for a container, then ship to Germany by sea. 7-15 working days. At the same time, they send the order information to DPD express to get the tracking number.
3, After about one month's sea voyage to the German port.
4, The shipping agent handles the customs clearance formalities, sorts the packages, and then sends them to the corresponding DPD express warehouse. 5-7 working days
5, DPD express start the delivery to customers, from now on, the logistics will be updates by DPD express. 3-7 days delivery.
In the 2-4 stages, the traking updates always write "DPD data centre, Order information has been transmitted to DPD."
CE


SGS

ISO9001

KC

IEC

UN38.3 Test


MSDS

